Cobb’s Landing Remodeling & Home Additions in Palm Harbor, FL

Cobb’s Landing is a deed-restricted, walled community of 381 custom single-family homes on Lake Tarpon in Palm Harbor. Most homes were built from the mid-1980s through the 1990s, and additions, structural changes and exterior work are reviewed by the community’s Design Review Board before construction begins.

G2 Home Services is currently building a rear home addition in The Pinnacle section. That project includes architectural drawings, structural engineering, a new roof tie-in and changes to the existing floor plan—exactly the kind of work where Cobb’s Landing’s design standards need to be considered early.

This guide covers the current DRB process, section-specific design rules, Pinellas County permitting and some of the conditions worth checking before remodeling a Cobb’s Landing home.

Last reviewed: October 2026. HOA, permitting and insurance requirements can change; homeowners should verify current requirements before construction.

Cobb’s Landing by the numbers

Homes: 381
Built: Primarily mid-1980s–1990s
Typical size: About 1,900–4,500+ sq. ft.
Sections: 4
DRB fee for an addition or renovation: $25
Permits from: Pinellas County

Home count and community information are from the Cobb’s Landing Community Association. Design standards, review requirements and fees are from the 2024 Design Review Manual. Build years and home sizes are based on local property and listing data.

How does Design Review Board approval work in Cobb’s Landing?

For additions, structural changes and exterior alterations, written DRB approval is required before work begins.

Major additions generally move through two design reviews: Initial Review and Major Review. Each review can take up to 31 days.

Initial Review

The first submission uses preliminary plans. Depending on the project, the package can include a site plan, floor plans, exterior elevations, building sections and survey information showing trees and grades.

The DRB reviews the concept and returns comments before the project moves into final construction documents.

Major Review

The Major Review uses the final plans. These can include the site plan, floor plans, exterior elevations, wall sections, fascia and trim details, landscape information, material samples and exterior colors.

The DRB has up to another 31 days to review the final submission.

Applications must reach the association’s management company at least three days before a scheduled meeting or they may move to the next meeting cycle. For a larger project, submitting a complete package the first time can prevent avoidable delays.

After approval, construction must begin within 90 days or the approval can be forfeited. Approved work is expected to be completed within one year and may not extend beyond 18 months after construction begins.

What design rules apply to my section of Cobb’s Landing?

Cobb’s Landing has four sections—Sanctuary I, Sanctuary II, The Estates and The Pinnacle—and the architectural standards are not identical in each one.

Section Roof material Minimum roof overhang Minimum garage
Sanctuary I Clay or concrete tile, cedar shake, pre-finished metal 24 in. 22 × 22 ft.
Sanctuary II Clay or concrete tile, cedar shake, pre-finished metal 30 in. 22 × 22 ft.
The Estates Same options, plus heavy textured dimensional fiberglass shingles 18 in. 20 × 20 ft.
The Pinnacle Clay or concrete tile only 12 in. 20 × 20 ft.

All four sections currently require a minimum 5/12 roof pitch. That matters on an addition because the new roof, elevations, trim and exterior materials have to work with both the existing house and the standards for that section.

Other rules that can affect a remodel

  • Vinyl and aluminum siding are not permitted.

  • Plywood, T1-11 and similar composition-board exterior finishes are not permitted.

  • Exterior colors require DRB approval.

  • Sanctuary I and II have additional requirements for carrying exterior materials around the home.

  • Retractable hurricane shutters require written approval.

  • Fences and walls are not allowed on individual lots; approved landscaping can be used for screening.

  • Pool screen enclosures have visibility and roof-pitch requirements.

  • Sheds have specific size, material and placement restrictions.

  • Driveway materials and widening are limited by the Design Review Manual.

For a major remodel or addition, these requirements are better handled during design than after the drawings are complete.

Who issues building permits in Cobb’s Landing?

Pinellas County.

Cobb’s Landing is in unincorporated Palm Harbor, so permits are handled through Pinellas County Building and Development Review Services after the applicable DRB approval is in place. Permit submissions for additions and larger remodels can require construction plans, site information, structural details and applicable product approvals.

Pinellas County currently uses a 14-day target for the first review of residential permits, but that is not a guaranteed approval time. Additions and other complex projects can require review by multiple departments, and actual timing varies with the project and current workload. The County publishes current review times on its live permitting dashboard. For most projects valued above $2,500, a Notice of Commencement must also be recorded with the Clerk of Court and provided before the first inspection. Different thresholds can apply to HVAC work.

What should you check in a 1980s or 1990s Cobb’s Landing home before remodeling?

The age of the neighborhood makes existing conditions especially important on larger projects.

Plumbing

Polybutylene water-supply piping was used in U.S. homes during part of the same period many Cobb’s Landing homes were built. It is often gray and may be stamped “PB2110.”

That does not mean every house in Cobb’s Landing has it, but it is worth identifying before a major remodel if plumbing will already be exposed or relocated.

Polybutylene can also create insurance underwriting issues. Citizens Property Insurance currently treats polybutylene as an unacceptable plumbing condition for certain new-business applications on homes more than 20 years old. Private-carrier requirements vary, so homeowners should verify the current rules with their insurer.

Roof condition and roof tie-ins

A home addition has to connect new roof framing and roofing materials to the existing structure. In Cobb’s Landing, the section-specific roof rules also affect what can be designed.

The Pinnacle, for example, allows only clay or concrete tile.

Roof age can matter for insurance as well. Florida law says an insurer cannot refuse to issue or renew a homeowners policy solely because a roof is less than 15 years old. Once a roof reaches 15 years, the homeowner must be given the opportunity to obtain an inspection before replacement is required solely because of age. If the qualifying inspection shows at least five years of useful life remaining, roof age alone cannot be the reason for refusal.

Electrical, HVAC and structure

For additions and larger remodels, G2 also looks at conditions such as:

  • Electrical service and panel capacity

  • HVAC capacity

  • Existing roof and wall framing

  • Load-bearing walls

  • Plumbing locations

  • Existing floor elevations

  • How the new structure will tie into the original home

Finding those issues during design is much better than discovering them after construction starts.

What does a remodel or addition cost in Cobb’s Landing?

There is no single useful square-foot price for a major Cobb’s Landing remodel or addition.

Cost depends on the existing home, project design and finish level. For an addition, major cost drivers can include architectural and engineering work, foundation and structural changes, roof design, HVAC and electrical capacity, plumbing, windows and doors, interior finishes, site access and the DRB requirements for the home’s section.

G2 prices larger projects around the actual scope and existing conditions rather than applying a generic neighborhood number.

Related services:

Room addition New Port Richey

How long does it take to get a Cobb’s Landing addition started?

For a substantial addition, think in months rather than days.

The DRB process alone can include two review periods of up to 31 days each, with design revisions and final drawings between them. County permitting follows the approved plans.

StageTypical timingWho
Design, engineering and drawingsDepends on scopeG2 + design team
DRB Initial ReviewUp to 31 daysCobb’s Landing DRB
Final drawings/revisionsDepends on commentsDesign team
DRB Major ReviewUp to 31 daysCobb’s Landing DRB
County permit reviewVaries; 14-day residential first-review targetPinellas County
Start constructionWithin 90 days of DRB approvalContractor

The monthly DRB meeting cycle can add time if an application is incomplete or misses the submission deadline.

Cobb’s Landing remodeling FAQ

Do I need DRB approval for a home addition in Cobb’s Landing?

Yes. Major additions go through Initial Review and Major Review, and written approval is required before construction begins.

The Design Review Manual focuses on additions, structural work, exterior changes and site improvements. For interior-only work, homeowners should confirm the current requirement with the association before starting.

Each of the two major review stages can take up to 31 days. Design revisions and the monthly meeting schedule can extend the overall timeline.

All Your Remodeling Questions Answered!

Download Your Free Cost Value Guide Now!

Discover the true value of your investment with our in-depth Cost Guide To Remodeling. 

Sign up with your email to receive exclusive access to local pricing trends, average remodel costs, and how much you recoup in the value of your home.

Empower your next remodeling project with the knowledge you need to make informed decisions.