From First Meeting to Final Walkthrough, How Long is a Kitchen Remodel’s Timeline?

The big picture: how long does a kitchen remodel take?

Kitchen remodel timeline at a glance

kitchen remodeling

Phase 1: The Initial Consultation (Free)

Phase 2: The Design Phase (Where the project becomes real)

Phase 3: Pre-Construction (Permits + ordering materials)

Phase 4: The Project Expectation Meeting (2 weeks before work begins)

Phase 5: Construction (Typically 6–10 weeks)

Week 1–2: Demo + rough-in.

Week 2–4: Framing + inspections + “behind-the-walls” work.

Week 4–6: Drywall + prime/paint + cabinets begin.

Week 6–8: Countertops + backsplash + flooring/trim details.

Week 8–10: Fixtures + final electrical + touch-ups.

Phase 6: Punch List + Closeout (The final 5%)

How to keep your kitchen remodel timeline on track

Ready to talk timeline for your kitchen?

All Your Remodeling Questions Answered!

Download Your Free Cost Value Guide Now!

Discover the true value of your investment with our in-depth Cost Guide To Remodeling. 

Sign up with your email to receive exclusive access to local pricing trends, average remodel costs, and how much you recoup in the value of your home.

Empower your next remodeling project with the knowledge you need to make informed decisions.